News BTB Jansky GmbH
Data Validation and Reconciliation (DVR) System PROCESSPLUS® at NPP Barakah 1 – 4 in the United Arab Emirates - Curtiss-Wright and BTB Jansky Win Contract Bid for Installation

German engineering and software company BTB Jansky and US-based company Curtiss-Wright were chosen to install the certified DVR system PROCESSPLUS® at the Nuclear Power Plant Barakah Units 1 – 4 of national utility Nawah Energy Company with headquarters in Abu Dhabi. The DVR system PROCESSPLUS® is installed as part of the FAMOS Plant Performance Monitoring System from Curtiss-Wright.
The four brand new APR-1400 Barakah Units 1 – 4 from South Korean supplier KEPCO have been commissioned and connected to the UAE grid in the period of 2020 – 2024. At a total output of 5,600 MWe they supply up to 25% of UAE’s electricity needs. Seamlessly integrated into the FAMOS System, PROCESSPLUS® will be used for quality-assured plant monitoring and continuous optimization of plant operation based on quality-assured reconciled process data.
PROCESSPLUS® facilitates the continuous optimization of plant operation based on quality-assured reconciled process data to continuously operate at 100% licensed power by applying reconciled correction factors for relevant process parameters and can be used for measurement uncertainty recapture uprates (MUR).
BTB Jansky and PROCESSPLUS® are certified according to the DVR standard VDI 2048 (2017).
For more information visit www.btbjansky.com or email BTB Jansky at info@btbjansky.com