| Q 85 | Author: | Dr. Ing. M. Langenstein, Dr. B. Laipple |
| Subject: | Global Balance of Plant Using Process Data Reconciliation according to VDI 2048 | |
| Medium: | ICONE 17, Paper 75490 July 12-16th, 2009, Brussels, Belgium | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 84 | Author: | Dr. Ing. M. Langenstein, S. Riehm, Jan Hansen-Schmidt |
| Subject: | Warranty test for a high-pressure turbine retrofit using Process Data Reconciliation in accordance with VDI 2048 | |
| Medium: | ICONE 16, Paper #48940, May 11-15th, 2008, Orlando, USA | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 83 | Author: | Jan Hansen-Schmidt |
| Subject: | Modellierung von Öl-Pipelines zur Ermittlung des Anlagenzustands und der Reduzierung der Messunsicherheiten von Durchflussmengenmessungen | |
| Medium: | VDI - 4. Fachtagung Messunsicherheit, Vortrag #27 12.-13. November 2008, Erfurt | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 82 | Subject: | Dr. Ing. M. Langenstein |
| Subject: | A quality control system for all measurements and their esti- mated uncertainties or Process monitoring and safety improvement system based on online data reconciliation according to VDI 2048 | |
| Medium: | AIST / SP Workshop, Mai 20-23, 2008, Tokyo, Japan | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 81 | Author: | Dr. Ing. M. Langenstein, A. Jansky MBA |
| Subject: | Process data reconciliation in accordance with VDI 2048 | |
| Medium: | EPRI, June 26-28, 2007, Annapolis, MD, USA | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 80 | Author: | Dr. Ing. Magnus Langenstein |
| Subject: | Process Data Reconciliation based on VDI 2048 in Nuclear Power Plants | |
| Medium: | IAEA, Mai 28-31, 2007, Prague, Tschechien | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 79 | Author: | Dr. Ing. Bernd Laipple, Dr. Ing. Magnus Langenstein |
| Subject: | New developments in Online Plant Monitoring | |
| Medium: | Icone 15, April 22-26,2007, Nagoya, Japan | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 78 | Author: | Dr.-Ing. Magnus Langenstein |
| Subject: | Tracer measurements compared to Process Data Reconciliation in accordance with VDI 2048 | |
| Medium: | Icone 15, April 22-26,2007, Nagoya, Japan | |
| On demand | Download: Icone15_Paper 10359_2007_(pdf/243k) |
| Q 77 | Subject: | Andy Jansky MBA |
| Subject: | Increasing plant efficiency and safety with Online Process Data Reconciliation | |
| Medium: | Icone 15, April 22-26,2007, Nagoya, Japan | |
| On demand | Download: Icone15_Paper10318_2007_(pdf/243k) |
| Q 76 | Author: | Dr.-Ing. Magnus Langenstein |
| On demand: | Presentation at the ANS Winter Meeting, Chair: H. Hashemian, Session: Diagnostics and Predictive Maintenance II, 11/15/2006 | |
| Medium: | ANS Winter Meeting, November 12-16,2006, Albuquerque, New Mexico | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 75 | Author: | Dr.-Ing. Magnus Langenstein, Dipl.-Ing. Jan Hansen-Schmidt |
| Subject: | The worlds' first ever cooling tower acceptance test using Process Data Reconciliation | |
| Medium: | ICONE 14, Paper #89643, July 17-20, 2006, Miami, USA | |
| On demand | Download: ICONE14 Paper #89643 (pdf/261k) |
| Q 74 | Author: | Andy Jansky MBA |
| Subject: | Financal benefits of Process Data Reconciliation in power generating plants | |
| Medium: | ICONE 14, Paper #89122, July 17-20, 2006, Miami, USA | |
| On demand | Download: ICONE14 Paper #89122 (pdf/340k) |
| Q 73 | Author: | Andy Jansky MBA |
| Subject: | Learning from the best with Process Benchmarking in nuclear power plants | |
| Medium: | ICONE 14, Paper #89121, July 17-20, 2006, Miami, USA | |
| On demand | Download: ICONE14 Paper #89121 (pdf/1,2MB) |
| Q 72 | Author: | Dr.-Ing. Magnus Langenstein |
| Subject: | Power recapture and power uprate in NPPS with Process Data Reconciliation in accordance with VDI 2048 | |
| Medium: | ICONE 14, Paper #89025, July 17-20, 2006, Miami, USA | |
| On demand | Download: ICONE14 Paper #89025 (pdf/454k) |
| Q 71 | Author: | Dr. J. Jansky |
| Subject: | Have any material tests been forgotten? | |
| Medium: | SMiRT 18, D07-3, August 7-12, 2005, Beijing, China | |
| On demand | Download: Have any material tests been forgotten? (pdf/896k) |
| Q 70 | Author: | Dr.-Ing. M. Langenstein, Dr. B. Laipple, H. Eitschberger, Dr. S. Streit |
| Subject: | A new method for evaluation and correction of thermal reactor power and present operational applications | |
| Medium: | ICONE 13, Paper #50577, May 16-20, 2005, Beijing, China | |
| On demand | Download: ICONE13 A new method for evaluation ...(pdf/600k) |
| Q 69 | Author: | Dr.-Ing. M. Langenstein, Dr. J. Jansky, Dr. B. Laipple, Frank Schmid |
| Subject: | Prozessdatenvalidierung nach VDI 2048 in konventionellen und nuklearen Anlagen | |
| Medium: | VDI -Tagung, November 18+19, 2004 in Düsseldorf | |
| On demand | Download: VDI Tagung2004 (pdf/430k) |
| Q 68 | Author: | Dr. J.Jansky |
| Subject: | Aging management - a new key word for inaction? | |
| Medium: | SMiRT 17, Paper #D438, August 17-22, 2003 Praque, Czech Republic | |
| On demand | Download: Aging Management (winzip/115k) |
| Q 67 | Author: | Dr. J. Jansky, L. Vogel |
| Subject: | Qualified Maintenance - An Approach for Cutting Costs in Power Plants | |
| Medium: | SMIRT 17, Paper #O434, August 17-22, 2003 Praque, Czech Republic | |
| On demand | Download: Qualified Maintenance (winzip/1,651k) |
| Q 66 | Author: | Dr.-Ing. M. Langenstein, Dr. J. Jansky |
| Subject: | Process data reconciliation in nuclear power plants | |
| Medium: | SMIRT 17, Paper #D435, August 17-22, 2003 Praque, Czech Republic | |
| On demand | Download: Process data reconciliation (pdf/212k) |
| Q 65 | Author: | L. Homann, H. Eitschberger, Dr.-Ing. M. Langenstein |
| Subject: | VDI2048-konforme Bewertung von Retrofit-Maßnahmen mit VALI III | |
| Medium: | Tagung am 3./4.06.03 in Hannover | |
| On demand | Download: VDI Vortrag (winzip/656k) VDI2048-Bewertung(winzip/200k) |
| Q 64 | Author: | Dr.-Ing. M.Langenstein / Dr. J.Jansky |
| Subject: | Process data reconciliation in Nuclear Power Plants | |
| Medium: | EPRI NPP-Improvement Seminar, July 2002, Saratoga Springs, USA | |
| On demand | Download: EPRI.pdf (winzip/2,9MB) (Mac.sit/5,7MB) |
| Q 63 | Author: | Th. Taschke / S. Wich- Schwarz |
| Subject: | Zustandsüberwachung von Komponenten durch mobile Schwingungsüberwachung | |
| Medium: | VGB-Tagung "Instandhaltung in Kraftwerken" vom 19.02.-21.02.2002 | |
| On demand | Download: vgb.pdf (winzip/184k) (Mac.sit/144k) |
| Q 62 | Author: | Dr. J.Jansky, Dr.-Ing.M.Langenstein |
| Subject: | VALI III Prozessdaten mit der Güte einer Abnahmemessung stündlich verfügbar und VDI 2048 konform | |
| Medium: | VDI-Workshop "Abnahmemessungen an energie- und kraftwerkstechnischen Anlagen-Richtlinie VDI 2048" vom 6.12.2001 | |
| On demand | Download: VALI_III.pdf (winzip/255k) (Mac.sit/260k) |
| Q 61 | Author: | Dr. J.Jansky / Dr.-Ing. M.Langenstein |
| Subject: | Process data validation in CCGT and nuclear power plants | |
| Medium: | SMIRT 16- conference in Washington von 12. - 17. August | |
| On demand | Download: SMIRT.pdf (winzip/2,4MB) (Mac.sit/2,1MB) |
| Q 60 | Author: | E. Grauf / Dr. J.Jansky / Dr.-Ing. M.Langenstein |
| Subject: | Reconciliation of process data in Nuclear Power Plants (NPPs) | |
| Medium: | 8 th International Conference on Nuclear Engineering (ICONE) April 2-8, 2000 Baltimore, MD USA. | |
| On demand | Download: Icone 8.pdf (winzip/600k) (Mac.sit/600k) |
| Q 59 | Author: | E. Grauf / Dr. J. Jansky / Dr.-Ing. M. Langenstein |
| Subject: | Investigation of the real process data on basis of closed mass- und energy balances in Nuclear Power Plants (NPPs) | |
| Medium: | SERA-Vol. 9, Safety Engineering and Risk Analysis-1999, Page 23-40; edited by J.L. Boccio; ASME 1999 | |
| On demand | Download: Icone 8.pdf (winzip/600k) (Mac.sit/600k) |
| Q 58 | Author: | Dr. J. Jansky |
| Subject: | Schwingungsmessungen und ihre Bedeutung für das Zustandswissen | |
| Medium: | DKIN-Fachkongress 18. und 19. November 1999, Abschnitt IV / 1 -37 | |
| On demand | Download: DKIN.pdf (winzip/480k) (Mac.sit/480k) |
| Q 57 | Author: | Dr. J. Jansky |
| Subject: | Database for assessing the life expectancy of pressure-retaining components in nuclear power plants | |
| Medium: | Nuclear Engineering and Design 190 (1999) 207 - 229 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 56 | Author: | E. Grauf und Dr.-Ing. M. Langenstein |
| Subject: | Datenvalidierung als Instrument zur Effizienzsteigerung in Kraftwerken (KKW) | |
| Medium: | VDI Berichte Nr. 1451, 1998, Seite 121 - 139 | |
| On demand | Download: Vortrag-VDI.pdf (winzip/600k) (Mac.sit/600k) |
| Q 55 | Author: | Dr. J. Jansky |
| Subject: | Databasis für die Lebensdauerbewertung von Komponenten in druckführenden Umschliessungen in KKWs | |
| Medium: | 22. MPA-Seminar, 10. und 11. Oktober 1996, Band 2, Vortrag 51 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 54 | Author: | Dr. J. Jansky und Dr.-Ing. M. Langenstein |
| Subject: | Integrity of the blowdown piping systems in a nuclear power plant - findings and consequences | |
| Medium: | Nuclear Engineering and Design 178 (1997) 195 - 209 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 53 | Author: | H. Röllke, und H. Räbiger, Dr. J. Jansky, Dr.-Ing. M. Langenstein, und F. Alt |
| Subject: | Abhitzekessel mit nachgeschalteten Dampfspeichern in einem Stahlwerk - Massnahmen zur Verfügbarkeitserhöhung | |
| Medium: | 21. MPA-Seminar, 5. und 6. Oktober 1995, Band 2, Vortrag 53 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 52 | Author: | R. Bonn, und Dr. J. Jansky |
| Subject: | Role of welding procedure and geometry in cracking of weld vicinities in stainless steel pipings of BWRS | |
| Medium: | PVP-Vol.301, Development in Pressure Vessels and Piping, Books No. H00964-1995 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 51 | Author: | R. Bonn, und Dr. J. Jansky |
| Subject: | Role of welding procedure and geometry in cracking of weld vicinities in stainless steel pipings of BWRS | |
| Medium: | PVP-Vol.301, Development in Pressure Vessels and Piping, Books No. H00964-1995 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 50 | Author: | Dr. J. Jansky, und Dr.-Ing. M. Langenstein |
| Subject: | Integrity of the blowdown piping systems in a nuclear power plant - findings and consequences | |
| Medium: | SMIRT 13, 1995, Volume II, Division F, Pressure Vessels and Piping, page 85 - 96 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 49 | Author: | Dr. J. Jansky, und Th. Andrä und K. Albrecht |
| Subject: | FEEDWATER PIPING GUILLOTINE BREAKS AT 340 °C OPERATION TEMPERATURE | |
| Medium: | SMIRT 12, 1993 Volume F, Pressure Components, Design Technologies and Research for Regulatory Needs, page 207 - 214 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 48 | Author: | Dr. J. Jansky / Dr.-Ing. M. Langenstein |
| Subject: | STRESS CORROSION CRACKING IN HOTWATER AND FEEDWATER VESSELS-FINDINGS AND CONSEQUENCES FOR OPERATION AND DESIGN | |
| Medium: | SMIRT 12, 1993 Volume F, Pressure Components, Design Technologies and Research for Regulatory Needs, page 165 - 170 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 47 | Author: | Dr. J. Jansky, und G. Dobmann |
| Subject: | INDICATION OF CREEP EMBRITTLEMENT IN LOW CARBON STEEL COMPONENTS USING NDT-METHODS | |
| Medium: | SMIRT 12, 1993, Volume G, Fracture Mechanics and Non-Destructive Evalution, page 243 - 248 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 46 | Author: | Dr. J. Jansky, C. Scherer und Th. Andrä |
| Subject: | NEW METHOD FOR ENSURING SAFAETY AND AVAILABILITY OF PRESSURE RETAINING COMPONENTS | |
| Medium: | PVC-Vol. 219, Transient Thermal Hydraulics and coupled Vessel and piping Systems Responses ASME 1991, page 25 - 34 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 45 | Author: | J. Jansky, Th. Andrä |
| Subject: | USE OF LEAK-BEFORE-BREAK CRITERIA FOR REMEDIAL LIFE ESTIMATION OF PRESSURE RETAINING COMPONENTS | |
| Medium: | PVP - Vol. 156, Transient Thermal-Hydraulics in Vessel and Piping Systems Book no. HOO471 - 1989, ASME Publication | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 44 | Author: | Dr. J. Jansky, H. Schulz |
| Subject: | Comments on the Present Practice of Fatigue Analysis of Nuclear Power Plant Components | |
| Medium: | Int. J. Pres. Ves. & Piping 34 (1988) 143-154 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 43 | Author: | Dr. J. Jansky, L. Heger und G. Katzenmeier |
| Subject: | Estimate of locations for repeated non destructive test procedures in Pressurized components of LWR's | |
| Medium: | SMIRT Conference 1987 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 42 | Author: | H. Schulz und Dr. J. Jansky |
| Subject: | Status of the fatigue analysis in the safety assement in nuclear power plants | |
| Medium: | ASTM-Meeting, New York., October 1985 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 41 | Author: | K. Kussmaul, K. Törrenen, und Dr. J. Jansky |
| Subject: | Cycle crack growth studios for predicting crack growth in HDR thermal shock experiments | |
| Medium: | IGSCC-Meeting Mai 1985, Tokio, Japan | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 40 | Author: | K. Kussmaul, E. Roos, A. Sauter und Dr. J. Jansky und J. Föl |
| Subject: | Assurance of Integrity of Steal Reactor Pressure Boundary Compenents | |
| Medium: | SMIRT Post Conference Seminar 28. und 29. August 1985, Ispra, Italy | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 39 | Author: | K. Kussmaul, D. Blind und Dr. J. Jansky |
| Subject: | Behavior of repaired areas in crackedRPV nozzle corner under simulated operation and emergency conditions | |
| Medium: | 8. SMIRT Conference, 1985, Post Conference at ISPRA, Italy | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 38 | Author: | K. Kussmaul, Dr. J. Jansky, P. Pfeffer, S. Krolop, W. Schmitt und D. Beukelmann |
| Subject: | Reactions of RPV Nozzle Areas to Loads Consistent with Operational and Accident Conditions | |
| Medium: | 8. SMIRT Conference, 1985 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 37 | Author: | W. Schmitt J.G. Blauel und Dr. J. Jansky |
| Subject: | Rissfortschrittsberechnungen (3D-FE) für die Stutzenkante des RDB bei Thermoschock und erster Vergleich mit Versuchsergebnissen | |
| Medium: | 8HDR-Sicherheitsprogramm, 8.Statusbericht Dezember 1984, Karlsruhe | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 36 | Author: | Dr. J. Jansky |
| Subject: | Initierung und Erweiterung von Rissen bei wiederholten thermischen Transienten in druckwasserführenden Bauteilen | |
| Medium: | Dissertation, Universität Stuttgart | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 35 | Author: | K. Kussmaul und Dr. J. Jansky |
| Subject: | Initierung von Rissen bei wiederholten thermischen Transienten in druckführenden Bauteilen | |
| Medium: | VGB-Kongress "Kraftwerke 1985" vom 22. bis 25. Oktober 1985 in Essen | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 34 | Author: | Dr. J. Jansky und R. Rintamaa |
| Subject: | Crack growth morphology in real pressure vessel and in small scale specimen under LWR conditions | |
| Medium: | 8. SMIRT Conference, 19. -23.August 1985, Belgien | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 33 | Author: | H. Werner und Dr. J. Jansky |
| Subject: | ||
| Medium: | Indian point-Bericht | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 32 | Author: | Dr. J. Jansky / D. Blind / G. Katzenmeier |
| Subject: | Erkenntnisse aus einem Rohrabriss an der HDR-Versuchsanlage unter Betriebsbedingungenmit Einfluss von hohem Sauerstoffgehalt | |
| Medium: | MPA-Seminar 11. und 12. Oktober 1984 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 31 | Author: | K.-H. Herter und Dr. J. Jansky |
| Subject: | Zyklische Beanspruchung | |
| Medium: | TWB-Bericht, 1984 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 30 | Author: | Dr. J. Jansky und TH. Bhongbhibhat |
| Subject: | Spannungsuntersuchungen am Druckbehälterstutzen bei Blowdownbelastung | |
| Medium: | Technischer Fachbericht PHDR 51-84, Juli 1984 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 29 | Author: | J. Jansky |
| Subject: | Untersuchungen zum Verhalten von Speisewasseranschl½ssen an Reaktordruckbehältern und Dampferzeugern von LWR bei thermischer Beanspruchung | |
| Medium: | BMI, 3. Technischer Bericht vom März 1983 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 28 | Author: | Schulz, Azodi, Glann, Dr. J.Jansky |
| Subject: | Berücksichtigung der thermoschockartigen Beanspruchung bei Druckwasserreaktoren GRS-A | |
| Medium: | August 1983, Auftragsnummer: 815 52 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 27 | Author: | Dr. J. Jansky, S. Krolop, R. Stegmeyer, P. Pfeffer, MPA Stuttgart Deuster, G., Brinette, R., IzfP-University Saarbrücken |
| Subject: | Pressurized thermal Shock Loading at Nozzle Corner Area of HDR-RPV | |
| Medium: | ASME-PVP Conference, San Antonio, June 17. - 21. 1984 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 26 | Author: | Dr. J. Jansky, H. Diem K.U. Müller |
| Subject: | Betriebsbegleitende Messungen an druckführenden Bauteilen | |
| Medium: | ||
| On demand | E-Mail: btb@btbjansky.com |
| Q 25 | Author: | K. Kussmaul, D. Blind, und J. Jansky |
| Subject: | Cracking in Feedwater Pipework of Lighter Water Reactors Causes and Remedies | |
| Medium: | Int. J. Pres. & Piping 17 (1984) 000-000 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 24 | Author: | K. Kussmaul,R. Rintamaa, Dr. J. Jansky, Kempainen und Törrönen, K |
| Subject: | On the Mechanism of Environmental Cracking Introduced by Thermal Loading | |
| Medium: | Conference on Corrosion at LWR-Systems | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 23 | Author: | Dr. J. Jansky, K.-H. Herter, MPA Stuttgart, J. G. Blauel, IWM-Freiburg, Munz, D. Stamm, H. IRB/ZSM Karlsruhe |
| Subject: | Versuchsergebnisse und Berechnungen zum Rissfortschritt bei zyklischer Thermoschocklast an einem Druckbehälterstutzen | |
| Medium: | HDR-Sicherheitsprogramm, 7. Statusbericht, Dezember 1983, Karlsruhe | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 22 | Author: | Kussmaul, K. und Dr. J. Jansky, MPA Stuttgart, Rintamaa, R., Kempainen und Törrönen, K., Finnland |
| Subject: | On the mechnism of environmental cracking introduced by cylic thermal loading | |
| Medium: | Espoo, 22. - 24. November 1983 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 21 | Author: | J. Jansky,J. Föhl,A. Sauter und S.K. Iskander |
| Subject: | Einfluss der Werkstoffzähigkeit auf Schädigung durch Thermoschock | |
| Medium: | 9. MPA-Seminar, 13. und 14. Oktober 1983, Stuttgart | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 20 | Author: | K. Kussmaul,D. Blind, und J. Jansky |
| Subject: | Safety Analysis of Circumferentially Cracked Feed Water Piping of lighter Water Reactors | |
| Medium: | 7 th SMIRT - Post-Conference Seminar | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 19 | Author: | J. Jansky, Ch. Doltsinis and G. Katzenmeier |
| Subject: | Stresses of Reactor Steel by Blowdown Loading | |
| Medium: | 7 th SMIRT-Conference, 22.8. bis 26.8.1983, Chicago | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 18 | Author: | K. Kussmaul, J. Jansky, R. Stegmeyer, und P. Pfeffer |
| Subject: | The Stressing of the Pressure Vessel under Operating and Upset Conditions | |
| Medium: | 7 th SMIRT-Conference, 22.8. bis 26.8.1983, Chicago | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 17 | Author: | J. Jansky, Ch. Doltsinis and F. Beißwänger |
| Subject: | Stresses in Piping Systems due to Blowdown Load, Comparison Between Experimental and Theoretical Results | |
| Medium: | 7 th SMIRT-Conference, 22.8. bis 26.8.1983, Chicago | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 16 | Author: | J. Jansky, und G. Rein, MPA Stuttgart, R. Rintamaa Technical Reserch Centre of Finland |
| Subject: | Growth and Formation of Cracks Originated by Cyclic Thermal Loading | |
| Medium: | ||
| On demand | E-Mail: btb@btbjansky.com |
| Q 15 | Author: | K. Kussmaul, D. Blind,J. Jansky, und R. Rintamaa |
| Subject: | Formation and Growth of Cracking in Feed Water Pipes and RPV Nozzles | |
| Medium: | IAEA - International Symposium on Reliabillity of Reactor Pressure Components Stuttgart, 21.-25. March 1983 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 14 | Author: | D. Blind, J.Jansky, und K.Kussmaul |
| Subject: | Rissbildungen in Speisewasserleitungen von Leichtwasserreaktoren - Ursachen und Abhilfemaßnahmen | |
| Medium: | VGB-Werkstofftagung 1983 in Düsseldorf | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 13 | Author: | J. Jansky, Stuttgart, J. Bartonicek, Baden und Schöckle, F. Leinfelden |
| Subject: | Ermittlung und Beurteilung der Beanspruchung im Bereich der Speisewasserstutzen von Kernkraftwerken | |
| Medium: | VDI-Bericht Nr. 480, 1983 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 12 | Author: | Ch. Doltsinis, und J. Jansky |
| Subject: | Reaktion und Beanspruchung des Reaktorsicherheitsbehälters bei Blowdown-Versuchen | |
| Medium: | HDR-Sicherheitsprogramm, 6. Statusbericht 1982 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 11 | Author: | K. Kussmaul, J. Jansky, R. Stegmeyer, und P. Pfeffer |
| Subject: | Die Beanspruchung des Druckbehälters unter Betriebs- und Störfallbedingungen | |
| Medium: | HDR-Sicherheitsprogramm, 6. Statusbericht, Dezember 1982, PHDR/KFK Karlsruhe | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 10 | Author: | J. Jansky, Ch. Doltsinis, and G. Katzenmeier |
| Subject: | Stresses in the HDR Containment Steel Shell due to static pressure and Water steam blow-down Tests | |
| Medium: | Gaithersburg, Maryland, October 12.-15., 1982 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 9 | Author: | J. Jansky |
| Subject: | The HDR-pressure vessel under operating and accident conditions | |
| Medium: | Second Finnish-German Seminar on Nuclear Safety 1982, Otaniemi, Finland, September 29.-30.1982 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 8 | Author: | K. Kussmaul, J. Jansky und Föhl |
| Subject: | The Consequence of the Coincidence of Irradiation Embrittlement; Surface Cracking and Pressurizid Thermal Shock in RPVs of LWRs | |
| Medium: | Chicago, Illinois, USA, August 29. - September 2.1982 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 7 | Author: | J. Jansky und F. Beisswänger |
| Subject: | HDR-Sicherheitsprogramm - Ergebnisse der HDR- Thermoschockversuchsreihe V66.0 und V66.1 | |
| Medium: | HDR-Sicherheitsprogramm 5. Statusbericht, Dezember 1981, PHDR/KFK Karlsruhe | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 6 | Author: | K. Kussmaul, D. Blind und Dr. J. Jansky |
| Subject: | Cracking in Ferritic Feedwater Piping Systems of Boiling Water Reactors | |
| Medium: | 6 th SMIRT-Conference, August 1981, Paris | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 5 | Author: | Dr. J. Jansky, A. Sauter und F. Beissänger |
| Subject: | Crack Initiation and Crack Growth at the Inner Nozzle Corner Surface under Thermal Shock Loading IAEA Specialists Meeting on Cycle Growth | |
| Medium: | Freiburg, 13. to 15. May 1981 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 4 | Author: | Dr. J. Jansky, A. Sauter, F. Beisswänger, R. Brinette, u. a. |
| Subject: | HDR-Thermoschockprogramm, Ergebnisse vom Modellbehälter (Vorstufe der Experimente am HDR-Druckgefäß) | |
| Medium: | HDR-Sicherheitsprogramm 4. Statusbericht, Dezember 1980, PHDR/KFK Karlsruhe | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 3 | Author: | Dr. J. Jansky, A. Sauter, F. Beisswänger |
| Subject: | HDR-Thermoschockprogramm - Ergebnisse von Untersuchungen an Platten und Modellbehälter (Vorstufe der Experimente am HDR-Druckgefäß) | |
| Medium: | HDR-Sicherheitsprogramm 3. Statusbericht, Dezember 1979, PHDR/KFK Karlsruhe | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 2 | Author: | Jansky, Tusel, Marotz |
| Subject: | Meerwasserentsalzung, Methoden und Entwicklungsrichtungen | |
| Medium: | Wasserwirtschaft 68 (1978) 4 | |
| On demand | E-Mail: btb@btbjansky.com |
| Q 1 | Author: | J. Ewald,F. Beisswänger, J. Jansky, und G. Maier |
| Subject: | Einzelheiten zu Simulation des Überhitzungszyklus in Schmelzschweißverbindungen | |
| Medium: | schweißen und schneiden, Heft 10/77 | |
| On demand | E-Mail: btb@btbjansky.com |